ICC Wales, Celtic Manor
Pro Steel Engineering was commissioned to create an iconic steel dragon for the new ICC (International Convention Centre) Wales.

🏴Canolfan Gynadledda Rhyngwladol Cymru, Celtic Manor
Comisiynwyd Pro Steel Engineering i greu draig ddur eiconig ar gyfer Canolfan Gynadledda Rhyngwladol Cymru.

A465 structure 27 Coed Ffyddlwn Bridge
For client Costain, on behalf of Welsh Government we recently installed two preassembled braced pairs.

St Albans Bridge
We were tasked by Alun Griffiths Contractors to fabricate and erect 115 tonnes of weathering steel on the five-span bridge that crosses the River Rhondda in Treherbert for Rhondda Cynon Taf Council. This project was in high-demand by its local users and we were happy that investment had been made to future-proof it.

🏴 Pont Sain Alban, Treherbert
Cawsom y dasg gan Alun Griffiths Contractors o adeiladu a chodi 115 tunnell o ddur gwrthdywydd ar y bont bum rhychwant sy’n croesi Afon Rhondda yn Nhreherbert, ar gyfer Cyngor Rhondda Cynon Taf.

Olympic Stadium
44 out of 56 columns within the Olympic Stadium required replacing and 4 more required strengthening with over plating and filling with concrete. Over 500 locations within the stadium required strengthening work.

Twickenham Stadium
We were tasked with extending a number of accommodation floors of the stadium which included a canopy structure to enclose it all.

Principality Stadium
The Principality Stadium management team pledged to provide the stadium with improved access for disabled guests as part of its commitment to improving accessibility. We fabricated and installed three large disability platform areas at several locations throughout the stadium.

Tata Steel
We were tasked by Tata Steel to replace critical structural assists within the Annealing Furnaces in a live operational area.

Mythe 1941 and 1964 eel screens
Pro Steel Engineering (PSE) was approached by CIM6 (Costain) after Severn Trent Water Ltd (STWL) identified four freshwater river intakes at the Mythe water treatment facility, that required overhauling works to minimise the environmental impact of STWL operations on the leptocephalus populations.