Hammersmith Flyover Strengthening – Phase 2

The works included supply and installation of strengthening steelwork, concrete drilling and coring and grouting of the steelwork into position. We provided temporary works solutions and supplied all project management, risk assessments and method statements for our works.

Learn more

Portsmouth Coil Drums

Our task was to assemble, weld and install two no coil drums for the MTL Group in Portsmouth for Pipecoil Technology and Magma Structures. Each drum consisted of four equal quarters each weighing 7.5 tonnes.

Learn more

Crossrail Bond Street Western Ticket Hall

We supplied technical supervision, management and independent inspection services for the top down construction of the new Bond Street Station as part of the Crossrail project.

Learn more

Birmingham New Street Station

The installation of primary steelwork and supply and install ancillary steelwork for VolkerFitzpatrick

Learn more

Queen Elizabeth Park Transformation Project

We were awarded a subcontract by BAM Nuttall to construct Bridge Y04 in the north of the Olympic Park near the Velodrome.

Learn more

Paddington

Our No.4 Kingdom Street project comprises of a basement and a ten storey steel frame with composite decked floor. This will provide a commercial building which will provide 13,700m2  of efficient and flexible commercial office space which is all supported from the existing “Cross Rail Box” structure.

Learn more

Yew Tree Underbridge

Pro Steel Engineering was contracted to 3D model, fabricate, application of the required protective treatment and concrete deck for the replacement underbridge. All manufacture was carried out at Pro Steel Engineering works and the two individual bridge decks delivered to site for client installation to be carried out. Sed nesciunt consectetur At esse quia At minus pariatur aut nulla galisum ad explicabo provident aut tempore perspiciatis sed rerum animi.

Learn more