A465 structure 27 Coed Ffyddlwn Bridge
For client Costain, on behalf of Welsh Government we recently installed two preassembled braced pairs.
![](https://prosteelengineering.co.uk/app/uploads/2022/04/IMG_0089-550x0-c-default.jpg)
St Albans Bridge
We were tasked by Alun Griffiths Contractors to fabricate and erect 115 tonnes of weathering steel on the five-span bridge that crosses the River Rhondda in Treherbert for Rhondda Cynon Taf Council. This project was in high-demand by its local users and we were happy that investment had been made to future-proof it.
![](https://prosteelengineering.co.uk/app/uploads/2022/04/IMG_0089-550x0-c-default.jpg)
🏴 Pont Sain Alban, Treherbert
Cawsom y dasg gan Alun Griffiths Contractors o adeiladu a chodi 115 tunnell o ddur gwrthdywydd ar y bont bum rhychwant sy’n croesi Afon Rhondda yn Nhreherbert, ar gyfer Cyngor Rhondda Cynon Taf.
![](https://prosteelengineering.co.uk/app/uploads/2022/05/Screenshot-2022-05-17-at-10.58.22-550x0-c-default.png)
Hammersmith Flyover Strengthening – Phase 2
The works included supply and installation of strengthening steelwork, concrete drilling and coring and grouting of the steelwork into position. We provided temporary works solutions and supplied all project management, risk assessments and method statements for our works.
![](https://prosteelengineering.co.uk/app/uploads/2022/05/Screenshot-2022-05-17-at-10.55.37-550x0-c-default.png)
Crossrail Bond Street Western Ticket Hall
We supplied technical supervision, management and independent inspection services for the top down construction of the new Bond Street Station as part of the Crossrail project.
![](https://prosteelengineering.co.uk/app/uploads/2022/05/Screenshot-2022-05-17-at-10.54.00-550x0-c-default.png)
Birmingham New Street Station
The installation of primary steelwork and supply and install ancillary steelwork for VolkerFitzpatrick
![](https://prosteelengineering.co.uk/app/uploads/2022/04/f9ba6573-9c7c-4ee9-a81b-0b0946044794-550x0-c-default.jpg)
Yew Tree Underbridge
Pro Steel Engineering was contracted to 3D model, fabricate, application of the required protective treatment and concrete deck for the replacement underbridge. All manufacture was carried out at Pro Steel Engineering works and the two individual bridge decks delivered to site for client installation to be carried out. Sed nesciunt consectetur At esse quia At minus pariatur aut nulla galisum ad explicabo provident aut tempore perspiciatis sed rerum animi.